PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing steel angles for the decking at Elev. 7 (2nd Floor) Facing South-West (800x600).jpg Plumbing pipes for the underground roughing Facing North (800x600).jpg Safety cables and poles at Derrick -2 Facing South (800x600).jpg Metal Decking at Derrick -3 (3rd Floor) Facing East (800x600).jpg Rebar mats for Elev. 4-Stair 2  (3rd floor) Facing West (800x600).jpg Surveying for the underground plumbing Facing North-West (800x600).jpg Installed temporary electrical outler Facing North   (800x600).jpg Installing temporary lighting Facing East (800x600).jpg Installing underground piping Facing South-East (800x600).jpg
Previous pageNext page Rebar mats for Elev. 4-Stair 2  (3rd floor) Facing West (800x600)
Rebar mats for Elev. 4-Stair 2 (3rd floor) Facing West (800x600)